当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在装有多台电梯的井道中,不同电梯的运动部件之间应当设置隔障是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在装有多台电梯的井道中,不同电梯的运动部件之间应当设置隔障
问题补充:

  • 匿名
2013-05-23 12:21:38
Should be set up every other barrier in the wells containing more than one elevator, the elevator moving parts
  • 匿名
2013-05-23 12:23:18
In a more than one elevator wells Road, different elevator between the moving parts should be set at intervals with disabilities
  • 匿名
2013-05-23 12:24:58
In is loaded with in multi-Taiwan elevator well, between the different elevator movement part must establish separates bonds
  • 匿名
2013-05-23 12:26:38
Multiple elevator shafts, between different parts of elevator should be setting barrier
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭