当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:测量(标高、轴线)--就位准备--钢柱吊装--校正并临时固定--柱最后固定--钢梁吊装-就位临时固定--柱间支撑吊装--钢屋架吊装--支撑吊装--檩条安装--面板安装等是什么意思?

待解决 悬赏分:1 - 离问题结束还有
测量(标高、轴线)--就位准备--钢柱吊装--校正并临时固定--柱最后固定--钢梁吊装-就位临时固定--柱间支撑吊装--钢屋架吊装--支撑吊装--檩条安装--面板安装等
问题补充:

  • 匿名
2013-05-23 12:21:38
Measurement (elevation axis) - in place ready - Finally fixed steel column lifting - correction and temporarily fixed - Column - Steel Beam lifting - in place temporary fixed - column support lifting - lifting steel roof trusses - support lifting - purlin installation - Panel Mount
  • 匿名
2013-05-23 12:23:18
Measurement (elevation, and axis) - The place to post - steel pendant - Correction and temporary fix - Post finally fixed beams - lifting - in place of temporary fixed column support lifting - steel roof trusses support lifting, lifting, purlin, panel mount, etc.
  • 匿名
2013-05-23 12:24:58
Survey (elevation, spool thread)--Takes place the preparation--Steel pole hoisting--Adjustment and temporary fixed--The column finally is fixed--The steel girder hoisting - takes place temporary fixed--Between the column supports the hoisting--Steel roof frame hoisting--Support hoisting--Purlin inst
  • 匿名
2013-05-23 12:26:38
Measurements (height, axis lines)-seated ready to--hoisting steel column-a correction and temporary fixed-finally fixed-column-steel beam-hoisting-seat temporary fixed-column-support-lifting-lifting – lifting-the-Purlin of steel roof truss installation-panel installation
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭