|
关注:1
2013-05-23 12:21
求翻译:本工程扫测阶段所需的船舶、设备、器材、人员全部准备完毕是什么意思? 待解决
悬赏分:1
- 离问题结束还有
本工程扫测阶段所需的船舶、设备、器材、人员全部准备完毕
问题补充: |
|
2013-05-23 12:21:38
Sweeping survey of the engineering phase of the necessary vessels, equipment, equipment, and personnel all ready
|
|
2013-05-23 12:23:18
This project required the sweep phase of vessels, equipment, and Equipment ready for all the people,
|
|
2013-05-23 12:24:58
This project sweeps measured the stage needs the ships, the equipment, the equipment, the personnel prepare to finish completely
|
|
2013-05-23 12:26:38
Sweeping survey of the engineering phase required all ships, equipment, facilities, personnel ready
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区