|
关注:1
2013-05-23 12:21
求翻译:直线地段轨枕采用新 Ⅱ型预应力混凝土轨枕,弹性调高扣件,橡胶垫圈,每公里铺设1680根.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
直线地段轨枕采用新 Ⅱ型预应力混凝土轨枕,弹性调高扣件,橡胶垫圈,每公里铺设1680根.
问题补充: |
|
2013-05-23 12:21:38
Linear lots sleeper type II prestressed concrete sleepers, elasticity increase fasteners, rubber washers to the laying of 1680 km.
|
|
2013-05-23 12:23:18
Straight line with the new sleeper lots II-prestressed concrete sleepers, flexible and high-fastener, rubber washer, 1680 kilometers of paved root.
|
|
2013-05-23 12:24:58
The straight line land sector railroad tie uses newly ⅡThe prestressed concrete railroad tie, the elasticity adjusts Gao Koujian, the rubber gasket, each kilometer lays down 1680.
|
|
2013-05-23 12:26:38
Sleeper line lot new ⅱ-type prestressed concrete sleepers, elasticity raise fasteners, rubber gaskets, laying of 1680 per kilometre.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区