求翻译:Before a DT is trained, a database consisting of different cases needs to be created first. Each case is represented by a vertor of system parameters and a final prediction objective. In this case, the objective is to successfully predict the impending unstable swings once a contingency occurs, and it can be obtained b是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Before a DT is trained, a database consisting of different cases needs to be created first. Each case is represented by a vertor of system parameters and a final prediction objective. In this case, the objective is to successfully predict the impending unstable swings once a contingency occurs, and it can be obtained b
问题补充: |
|
2013-05-23 12:21:38
一个dt的训练之前,必须先建立由不同情况的数据库。每种情况下由系统参数和最终预测目标的vertor表示。在这种情况下,目标是要成功地预测即将发生的不稳定摆动一次出现的情况下,它可以通过完整的时域仿真来获得。每个模拟,不安全的评估结果再提供一次发生器角度的分离超过阈值(例如,180度)。
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
在一 DT 之前被训练,包含不同案例的一个数据库需要首先被创造。每个案例被系统参数和最后预言目标的一 vertor 代表。在此情况下,目标是成功预测迫近不稳定的秋千一旦一个意外事故发生,它可以被全职域模拟获取。对每个模拟,一个不安全的评估结果然后被提供一旦发电机的分离钓鱼超过一 threshold(e.g.,180degree)。
|