求翻译:i. It could be very costly to install a PMU for every generator especially when the size of power system grows large, although measuring power angles directly can reflect system transient behavior more intuitively. Besides, the collection of generator angles of generators based on the unit commitment schedule.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
i. It could be very costly to install a PMU for every generator especially when the size of power system grows large, although measuring power angles directly can reflect system transient behavior more intuitively. Besides, the collection of generator angles of generators based on the unit commitment schedule.
问题补充: |
|
2013-05-23 12:21:38
我。它可能是非常昂贵的安装PMU每发电机,特别是当电力系统的规模变大,虽然直接测量电源的角度可以更直观地反映系统的暂态行为。此外,发电机的收集角的基础上,单位承诺的时间表发电机。
|
|
2013-05-23 12:23:18
i.\t它可能是非常昂贵的安装每台发电器的PMU,特别是当动力系统的大小增长大时,虽然测量的力量角度可能直接地反射系统过渡过程特性更加直觉地。其外,发电器发电器角度的汇集根据单位承诺日程表的。
|
|
2013-05-23 12:24:58
i. It could be very costly to install a PMU for every generator especially when the size of power system grows large, although measuring power angles directly can reflect system transient behavior more intuitively. 其外,发电器发电器角度的汇集根据单位承诺日程表的。
|
|
2013-05-23 12:26:38
一、 它可能是很昂贵,尤其是在电力系统的大小变大,虽然直接测量功率角度可以反映系统瞬态行为时更直观地安装每个发电机的 PMU。此外,发电机发电机角度的集合的基础的单位的承诺计划。
|
|
2013-05-23 12:28:18
我。在大小的力量系统渐渐变大的时可能很昂贵的尤其安装对于每台发电机的一 PMU,虽然测量力量直接钓鱼更直观地可以反映系统瞬时现象行为。再说,发电机的收集根据单位承诺时间表的发电机的钓鱼。
|