当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:With central drift method in construction, after the excavation of left tube upper bench, inverted arch part of the left hole loose loose zone and the formation of the middle drift before excavation area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when是什么意思?

待解决 悬赏分:1 - 离问题结束还有
With central drift method in construction, after the excavation of left tube upper bench, inverted arch part of the left hole loose loose zone and the formation of the middle drift before excavation area overlapping to form an organic whole, slide easily happened bias, be sure to strengthen monitoring measurement, when
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
中央漂泊方法在建筑,在左管上部长凳的挖掘以后,左孔的被倒置的曲拱零件宽松宽松分区,并且中间漂泊的形成在重叠挖掘的区域前的形成一个有组织的整体,滑容易地发生倾斜,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
  • 匿名
2013-05-23 12:24:58
以中央漂泊方法在建筑,在左管上部长凳的挖掘以后,左孔的被倒置的曲拱零件宽松宽松分区,并且中间漂泊的形成在挖掘区域之前重叠形成一个有组织的整体,滑容易地发生倾斜,是肯定加强监视测量,当隧道中间墙壁重音价值的建筑是10.3 MPa。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
以在建造中的中央漂流物方法,在左边管子的挖掘之后上层的长凳,使部分左边孔松散地松散地将其分区的拱转化和中间的漂流物的构成重叠形成一个组织的整体的挖掘地区滑动容易被发生的偏见之前,在隧道中间墙压力价值的建造是 10.3 MPa 时,确保加强监测测量。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭