求翻译:3.4.3.1 method of building block method is correct, when masonry should "hole, seam back masonry", masonry operation to use "three one" method, namely "a shovel ash, a brick, a squeeze".3.4.3.2 horizontal mortar seam dug within 15MM, and the mortar should be full, flat and smooth, the main seam filled mortar.3.4.3.3 bl是什么意思? 待解决
悬赏分:1
- 离问题结束还有
3.4.3.1 method of building block method is correct, when masonry should "hole, seam back masonry", masonry operation to use "three one" method, namely "a shovel ash, a brick, a squeeze".3.4.3.2 horizontal mortar seam dug within 15MM, and the mortar should be full, flat and smooth, the main seam filled mortar.3.4.3.3 bl