|
关注:1
2013-05-23 12:21
求翻译:The Engineer did not give any written reply to the Contractor’s above letter, instead in the 16th Site Coordination Meeting held on March 07, 2007,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Engineer did not give any written reply to the Contractor’s above letter, instead in the 16th Site Coordination Meeting held on March 07, 2007,
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区