当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Reinstall the bearings on the shaft according to the bearing manufacturer's instructions. After installation make sure there is no clearance between the bearings and the shoulder on the shaft. If heat is used to install the bearings the clearance should be checked after the assembly has cooled.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Reinstall the bearings on the shaft according to the bearing manufacturer's instructions. After installation make sure there is no clearance between the bearings and the shoulder on the shaft. If heat is used to install the bearings the clearance should be checked after the assembly has cooled.
问题补充:

  • 匿名
2013-05-23 12:21:38
根据轴承制造商的指示重新安装在轴上的轴承。
  • 匿名
2013-05-23 12:23:18
根据轴承制造商的指示再安装在轴的轴承。在设施确定以后没有在轴承和肩膀之间的清除在轴。如果热用于安装轴承清除应该核算,在汇编冷却了后。
  • 匿名
2013-05-23 12:24:58
根据轴承制造商的指示再安装轴承在轴。 After installation make sure there is no clearance between the bearings and the shoulder on the shaft. 如果热用于安装轴承清除应该核算,在汇编冷却了之后。
  • 匿名
2013-05-23 12:26:38
上轴轴承制造商的说明重新安装轴承。安装确认后还有没有间隙,轴承和轴上的肩膀。如果热量用来安装轴承冷却大会后,应检查间隙。
  • 匿名
2013-05-23 12:28:18
根据承重的制造商的指示在杆上重新安装举止。安装确保后在杆上没有举止和肩之间的清除。如果热度用于安装举止清除集会变冷了后应该被检查。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭