当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Chimoré Cochabamba - The Road section was built in the late 1960s, and opened to traffic in the early 1970s, with a surface layer of Asphalt Surface Treatment Double acting (TSD) covering its entire length with the exception of the sector of the building. Subsequently, from 1984 to 1988 was built the central section Ch是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Chimoré Cochabamba - The Road section was built in the late 1960s, and opened to traffic in the early 1970s, with a surface layer of Asphalt Surface Treatment Double acting (TSD) covering its entire length with the exception of the sector of the building. Subsequently, from 1984 to 1988 was built the central section Ch
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
科恰班巴 Chimor é - 公路建于 1960 年代 , 在 1970 年代初的表面层沥青表面处理双作用 ( TSD ) 涵盖其整个长度的异常的部门的建设。 后来 , 从 1984 年至 1988 年建造的中央部分 Chimor é - Yapacaní ( 150 公里 ) 使之成为可能的新的道路之间的链接科恰班巴和圣克鲁斯。
  • 匿名
2013-05-23 12:24:58
Chimoré Cochabamba -路部分在60年代末期被建立了,并且被打开在70年代初期交易,以沥青表面处理双向作用的TSD一个表层 () 包括它的整个长度的除大厦的区段之外。 随后,从1984年到1988年被创立了中央部分Chimoré - Yapacaní (由) Cochabamba和圣克鲁斯之间的新的路链接使成为可能的150公里长。
  • 匿名
2013-05-23 12:26:38
Chimoré 科恰班巴-路段建于 1960 年代末,,在 1970 年代初期,表面层的沥青表面处理双作用 (TSD) 覆盖其整个长度除了部门以外的建设通车。随后,从 1984 年到 1988 年建成中部 Chimoré-Yapacaní (长度 150 公里) 可能由新路科恰班巴和圣克鲁斯之间的联系。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭